Streetcar Stop Construction

Streetcar Stop Construction

The streetcar stop at 12th & Main is under construction.

ApertureShutter SpeedFocal LengthISO
f/81/500 s14 mm200

In album: Cincinnati Streetcar Construction and Testing 2015

  1. Walnut Street
  2. Walnut Street
  3. Walnut Street
  4. Streetcar Stop Construction
  5. Resurfaced Central Parkway
  6. Resurfaced Central Parkway
  7. Resurfaced Central Parkway