Resurfaced Central Parkway
Central Parkway has been resurfaced around the completed streetcar track.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/8 | 1/400 s | 14 mm | 200 |
In album: Cincinnati Streetcar Construction and Testing 2015
Central Parkway has been resurfaced around the completed streetcar track.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/8 | 1/400 s | 14 mm | 200 |
In album: Cincinnati Streetcar Construction and Testing 2015