Resurfaced Central Parkway
Central Parkway has been resurfaced around the completed streetcar track.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/9 | 1/500 s | 7 mm | 200 |
In album: Cincinnati Streetcar Construction and Testing 2015
Central Parkway has been resurfaced around the completed streetcar track.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/9 | 1/500 s | 7 mm | 200 |
In album: Cincinnati Streetcar Construction and Testing 2015