Mercer Commons
The parking garage rises at Mercer Commons. The empty lot in the foreground will be developed during Phase 2.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/5 | 1/160 s | 14 mm | 100 |
In album: Mercer Commons Construction 2013
The parking garage rises at Mercer Commons. The empty lot in the foreground will be developed during Phase 2.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/5 | 1/160 s | 14 mm | 100 |
In album: Mercer Commons Construction 2013