Construction
After nearly a year of constant utility work on my street, they appear to be almost finished. They're ripping out all of the temporary asphalt patches and replacing them with an actual concrete sidewalk.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/5.6 | 1/30 s | 18 mm | 100 |
In album: Uptown Cincinnati 2010