Cutter Playground Construction
Construction has started on the Cutter Playground/Ziegler Park renovation project. A new underground parking garage will be built at this location with green space above. The park is adjacent to the Alumni Lofts project.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/5.6 | 1/640 s | 14 mm | 200 |
In album: Over-the-Rhine 2016