The Banks Phase 3

The Banks Phase 3

The parking garage that will support Phase 3 of The Banks is now under construction.

ApertureShutter SpeedFocal LengthISO
f/91/500 s7 mm200

In album: Cincinnati CBD 2016

  1. Ohio River
  2. Smale Riverfront Park and The Banks
  3. The Banks Phase 3
  4. The Banks Phase 3
  5. Smale Riverfront Park and The Banks
  6. Smale Riverfront Park and The Banks
  7. 901 Elm Street