15th and Race
The 15th and Race site is being developed by 3CDC. The first phase includes a new 3-story building featuring 17 condos and 2-3 commercial storefronts.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/7.1 | 1/400 s | 14 mm | 200 |
In album: Over-the-Rhine 2016