Cincinnati Streetcar Construction

Cincinnati Streetcar Construction

The final pieces of track for the Cincinnati Streetcar's downtown/OTR loop are being installed at the corner of 2nd and Main.

ApertureShutter SpeedFocal LengthISO
f/91/500 s24 mm200

In album: Cincinnati Streetcar Construction and Testing 2015

  1. Resurfaced 12th & Main
  2. Resurfacing Main Street
  3. Resurfacing Main Street
  4. Cincinnati Streetcar Construction
  5. Cincinnati Streetcar Construction
  6. Cincinnati Streetcar Final Weld
  7. Cincinnati Streetcar Final Weld