Henry Street
Repaving and overhead contact system (OCS) work is being completed near the Operations Facility (MOF) on Henry Street.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/9 | 1/640 s | 14 mm | 200 |
In album: Cincinnati Streetcar Construction and Testing 2015