Third and Walnut Construction
The intersection of Third and Walnut has been reconstructed in preparation for streetcar track installation in a few months.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/5.6 | 1/200 s | 7 mm | 100 |
In album: Cincinnati Streetcar Construction and Testing 2015