Third and Walnut Construction

Third and Walnut Construction

The intersection of Third and Walnut has been reconstructed in preparation for streetcar track installation in a few months.

ApertureShutter SpeedFocal LengthISO
f/5.61/200 s7 mm100

In album: Cincinnati Streetcar Construction and Testing 2015

  1. Walnut Street Construction
  2. Walnut Street Construction
  3. Walnut Street Construction
  4. Third and Walnut Construction
  5. Race Street
  6. Race Street
  7. Elder Street Spur