Cincinnati Streetcar Construction
Crews are prepping the bridges over Fort Washington Way for installation of streetcar tracks.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/4 | 1/160 s | 45 mm | 100 |
In album: Cincinnati Streetcar Construction 2014
Crews are prepping the bridges over Fort Washington Way for installation of streetcar tracks.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/4 | 1/160 s | 45 mm | 100 |
In album: Cincinnati Streetcar Construction 2014