Repaving Elm Street

Repaving Elm Street

Now that streetcar track installation and utility work is complete along Elm Street, the remaining part of the street is getting resurfaced. Notice that the new traffic signal at Elm and Findlay has been activated.

ApertureShutter SpeedFocal LengthISO
f/2.51/800 s14 mm100

In album: Cincinnati Streetcar Construction 2014

  1. Rebuilt Elm Street
  2. Repaving Elm Street
  3. Repaving Elm Street
  4. Repaving Elm Street
  5. Power Substation at Findlay Market
  6. Race Street Track Work
  7. Maintenance and Operations Facility