308-316 Main Street

308-316 Main Street

July 2014 | July 2016

In 2012, 3CDC announced plans for a $9 million renovation to convert these buildings into five condos and two commercial storefronts. However, that plan fell apart, and it was later announced that the buildings would be converted into a hotel.

ApertureShutter SpeedFocal LengthISO
f/7.11/250 s7 mm100
  1. Downtown Parking Lots
  2. AT580
  3. 308-316 Main Street
  4. 308-316 Main Street
  5. Third Street
  6. Fort Washington Way
  7. Second Street Sidewalk Replacement