Streetcar Construction
Streetcar construction has reached the "Gateway Quarter" area of Over-the-Rhine, near the intersection of 12th and Vine.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/7.1 | 1/250 s | 42 mm | 100 |
In album: Cincinnati Streetcar Construction 2014