Streetcar Construction

Streetcar Construction

Streetcar construction is now occurring on 12th Street, roughly between Doerr Alley (west of Vine Street) and Brackett Alley (east of Walnut Street).

ApertureShutter SpeedFocal LengthISO
f/7.11/200 s29 mm100

In album: Cincinnati Streetcar Construction 2014

  1. Streetcar Construction
  2. Streetcar Construction
  3. Streetcar Construction
  4. Streetcar Construction
  5. Streetcar Construction
  6. Streetcar Construction
  7. Streetcar Construction