Streetcar Construction

Streetcar Construction

The southbound streetcar will make a protected right turn (across stopped traffic) from Central Parkway to Walnut Street.

ApertureShutter SpeedFocal LengthISO
f/81/640 s14 mm100

In album: Cincinnati Streetcar Construction 2014

  1. Elm and Liberty Streetcar Stop
  2. Streetcar Stop at Rhinegeist
  3. Streetcar Work at Rhinegeist
  4. Streetcar Construction
  5. Streetcar Construction
  6. Finished Streetcar Track
  7. Finished Streetcar Track