Central Parkway Streetcar Construction
Pavement is being removed from Central Parkway for the installation of streetcar track, while part of the median is being removed to make room for a streetcar stop.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/2.2 | 1/1866 s | 4.1 mm | 40 |
In album: Cincinnati Streetcar Construction 2014