Utility Work
Utility work at Central Parkway and Main Street in preparation for Cincinnati Streetcar construction.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/2.2 | 1/1520 s | 4.1 mm | 32 |
In album: Cincinnati Streetcar Construction 2014
Utility work at Central Parkway and Main Street in preparation for Cincinnati Streetcar construction.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/2.2 | 1/1520 s | 4.1 mm | 32 |
In album: Cincinnati Streetcar Construction 2014