Cincinnati Streetcar Construction
Normal track work on Race Street ends at this point just south of Findlay Market. Track north of this point will be "special", and will include a lane change, two turnouts for Phase 1B of the project, and turnouts for the maintenance facility.
| Aperture | Shutter Speed | Focal Length | ISO |
|---|---|---|---|
| f/7.1 | 1/320 s | 14 mm | 100 |
In album: Cincinnati Streetcar Construction 2014